Honmoku Branch (East Warehouse)

We have a raised platform and an indoor loading area, allowing us to safely and quickly handle container cargo. In addition, electric forklifts are used in Temperature-contorolled warehouses to prevent dust from exhaust gas.

Location

3 Honmoku Pier, Naka-ku, Yokohama

TEL 045-622-5595
FAX

045-623-7444

Site

3,524㎡

Warehouse

1 building 8,421㎡

Storage capacity

14,000 tons

Facility equipment

normal temperature, Temperature-contorolled

Equipment outline

Structure: High-floor reinforced concrete 3-story building

We will propose the optimal transportation route, transportation method, storage, and moving to suit your needs.
Please feel free to contact us. Our sales representative will explain the details in detail.